The crew that came to do the siding was efficient but I did have some issues. The siding around the west side water line was cut about 1/2” high on the top and bottom. I also had a 240 volt plug on the east side of the house and they could not figure out how to box it in. I was told that it could not be done by Cody. The dumpster that was rented left dents in my driveway. Prairie sent out another person to look at the problems and able to solve them. I also had a hard time communicating with the painters as they did not speak English very well